Product Description

Size |
3*5.95*2.8m |
Structure |
Galvanized Steel |
Wall Panel |
50/75/100mm EPS sandwich panel /rock wool sandwich panel/Bamboo wood fiber graphene insulation board,0.3/0.35/0.4/0.45mm steel sheet Glass wool panel |
Wall Color |
Grey, white color and optional colors |
Roof |
50mm thick glass wool+iron skin |
Door |
Steel door/ Aluminum door(optional ) |
Window |
Aluminum/ PVC sliding door with security bar (optional) |
Floor |
MGO board /18mm Cement board (optional) |
Electricity |
Customers can purchase locally |
Install Time |
4 Workers 3 hours |
Basic Info. |
|
|
|
Model NO. |
Detachable Container House |
Structure |
Steel Luxury Container House |
Material |
Steel Structure |
Life Span |
15 -25 Years |
Keyword |
Prefabricated House |
Number of The Guest |
1-4 People |
Product Type |
Assembled Container House |
Certification |
CE |
Main Material |
OSB+ Bamboo Fiber Board |
Warranty |
1 Years |
Use |
Hotel |
Specification |
|
Size |
Customized Size |
Trademark |
WFZH |
Wall |
50mm/75mm Sandwich Panel |
Production Capacity |
3000 Sets/Month |
Door |
Steel Door |
Advantage |
Easy Installation |
Waterproof |
for The Whole House |
Project Solution Capability |
CAD/3D One-Stop Solution |
Advantages of detachable container houses
1. Fast construction and quick commissioning
Prefabricated production: The main structure and internal facilities (such as walls, doors and windows, water and electricity pipelines) are prefabricated in the factory in advance, and only need to be assembled on site, which shortens the construction period by more than 50% compared with traditional buildings.
Ready-to-use: A single house can be built in 1-3 days at the fastest, which is suitable for emergency relief, temporary camps and other emergency needs.
2. Low cost and significant economic benefits
Low material cost: mainly steel and container bodies are used, and the price of raw materials is stable and lower than that of traditional brick-concrete structures.
Low labor and time costs: reducing on-site construction personnel and construction period, and the comprehensive cost is 30%-50% lower than that of traditional buildings.
Reusable: It can be transported or disassembled as a whole during demolition, with a recycling rate of more than 80%, reducing long-term use costs.
3. High flexibility, adaptable to various scenarios
Modular combination: A single container is a standard module (common size: 6m×2.4m×2.6m), which can be flexibly combined into villas, office buildings, hotels and other types of apartments through horizontal splicing (parallel) or vertical stacking (multi-layer).
Convenient mobility: It can be transported as a whole by trucks and cranes, suitable for scenes that require frequent relocation, such as construction sites, tourist attractions, and field operations.
4. Green and environmentally friendly, strong sustainability
Low carbon and energy saving: The construction process reduces dust, noise and construction waste (reducing waste by more than 90% compared with traditional buildings), which is in line with the concept of green buildings.
Recycling: Steel can be recycled and processed, and no permanent waste will be generated after elimination.
5. Strong structure and high safety
Earthquake and wind resistance: The steel structure frame can withstand a magnitude 7 earthquake and a magnitude 10 typhoon (needs to be reinforced according to the design standards), which is better than some temporary buildings.
Fireproof and anti-corrosion: The wall materials are mostly made of fireproof and heat-insulating materials such as rock wool and glass wool, and the surface is treated with rust prevention, with a service life of up to 10-15 years (under regular maintenance).
Detailed Photos
Company Profile


Certifications

Packaging & Shipping


FAQ
1. Q: Are you a factory or trading company?
A: WeiFang Zhonghui Lvjian Steel Structure Co., L.td. We are a factory that has been engaged in prefabricated housing for ten years and often provide outsourcing services to foreign trade companies. Welcome to visit our factory~
2.Q: What's your supply capacity?
A: Annual Production: container house 60000sets, prefab house 364000square meters, steel structure 240000square meters.
3. Q: How to install ?
A: We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation,wages will be provided by buyers.
4.Q: Could you design a new and unique prefab house for me?
A: Of course! We have the most professional design team to integrate your demand to provide you with one-stop customization service.
5.Q: What do I need to provide to build a prefab house?
A: It would be better if you could provide a sketch. If not, you just need to tell us your demands, such as area, house use, etc., and we can make the corresponding design for you.
6.Q: How to get the quotation of the project?
A: If you can provide design drawings and required materials, we can quote according to your needs. Besides, If you don't have a drawing, we can also offer you a quotation after telling us the purpose and demand of your prefabricated house.
7.Q: How to control the cost of building a prefab house?
A: After confirming the design plan, you can choose the corresponding building materials according to your own need since each material has its own price.
8.Q: what are the advantages of prefab house?
A: It is prefabricated in the factory, which does not take up construction time on the site; it can be modularly assembled, which is convenient for transportation and can be moved to achieve recycled use.
9.Q: What are the uses of this type of house?
A: It has multiple applications and can be used as hotels, offices, shops, residences, etc.
10.Q: How long does it take to build a prefab house?
A: It depends on the size of the house and complexity of the house. Usually, a 50 square meters' house takes 5 workers to complete in 1-3 days.
11.Q: What is the delivery time?
A: The delivery time depends on the quantity and the complexity of the house. Usually, the delivery time is 7-35 days after receiving the deposit.
12.Q: How to install?
A: We will provide you with installation instructions and videos, or send a technician to assist you if necessary. However, you are responsible for their wages, visa fees, airfare and accommodation.
13.Q: How do youguarantee the quality of the products?
A: We always put quality first. Every product produced in our factory must pass the strict quality test before it is delivered to the customer.
14. Q: What is your MOQ?
A: One set.
15. Q: What is your payment term?
A: 70% deposit by T/T in advance, 30% balance payment before shipment.
16.Q: What trade terms do you accept
A: EXW, FOB, CIF, etc.